Access Shafts and Start-up Galleries of Phase 1 Jurong Rock Cavern

Overview

123
123

Client:

Jurong Town Corporation

 

Location:

Jurong Island, Singapore

 

Sector:

 Energy

 Ground

 Tunnel

 

Expertise:

  •  Design and Construction

  •  Deep Excavation

  •  130m Deep Shaft

  •   NATM Method

  •  Rock/Fissure Grout

  •  Blasting